Jones Nat, at long last...
Jan
6Jones Nat, at long last...
Posted by Kevin Doak on Tuesday at: 2:20am (January 6th, 2009)
The University was still shut down when I returned on Saturday, Sunday they were closed as well. Monday I was back in the weight room, dryland and 3200 yards in the pool. Absolutely wiped out by the end of the 2.5 hour workout. It was great to be back in a world class pool after that much time off. While the pool was shut down they replaced the pump system which will decrease the facilities downtime and allow for more consistent temperature control. As well as making my good friend Tim's (the pool guy) job much easier!
The secondary "club" pool was damaged sometime recently as well. Reports point to the scuba class in the water at the time. The observation window, which is probably close to bulletproof glass first cracked, then broke, leaking 100 gallons a water an hour into the underground room!
Who knew it was that exciting to look after a pool system!
The secondary "club" pool was damaged sometime recently as well. Reports point to the scuba class in the water at the time. The observation window, which is probably close to bulletproof glass first cracked, then broke, leaking 100 gallons a water an hour into the underground room!
Who knew it was that exciting to look after a pool system!